WPC Tile Factory Introduces The Installation Steps Of The Top Angle Line

Comments · 130 Views

WPC Tile Factory introduces the installation steps of wall panels:

 

WPC Tile Factory introduces the installation steps of wall panels:

1. Installation steps of buckle connection wall panel

â‘ With stainless steel locking plate
â‘¡ Splice the wall panels in turn, or directly fix them on the wall with air gun nails (screws are available).

2. Installation steps of top angle line
The U-groove of the top corner line only needs to use the leftover material of 300 large boards.

â‘ Put the straight
â‘¡ After fixing the supporting clips with an air gun or glass glue, the frame wires are fixed on the wall with screws.
Just snap it on and cut 45° at the corner to join together, and the installation is complete.

3. Installation steps of baseboard
â‘ Fix the large card strip to the wall with screws.
â‘¡The skirting line can be lightly "pressed and buckled" on the big card strip, and the installation is complete.

4. Installation steps of waist line/frame line
â‘ Frame line Door cover line/waist line.
â‘¡Fix the collapsible card strip "section section" directly to the waistline/frame line of the wall with screws and gently "press and buckle" on the card strip, and the installation is complete (installation steps of the waistline and frame line series) Same).

Through the above introduction, WPC Decking for Sale Suppliers hopes that you can simply refer to the content of this article in future use.

 